LH & RH Generator

In by Chris Garville

Image
COC Aerospace - Proprietary and Confidential Company Information

AS9100D

PLATFORM: Northrop F-5 / T-38
PRODUCT: LH & RH Generator. P/N: 978J898-2
TECH PUBLICATIONS: T.O. 8A6-5-8-3 & 8A6-5-8-4

The Westinghouse-designed Hamilton Sundstrand generator that provides electric power to the F-5, two (2) per aircraft, are long out of production.

These units have been repaired or overhauled many times, often with just a quick clean and revarnish, that they are now in need of replacement.

COC’s Revolutionary Support for F-5 & T-38 has teamed up with a renowned aircraft electric motor company to remanufacture these generators.

COC is also providing a 2-Year Warranty on these generators.

Image

Scope of Work

Perform teardown, test and evaluation of part.

Provide cost to completely remanufacture unit based on findings.

Image

Sample of a NOPERATIONAL F-5 GENERATOR

Image
Image
Image
Image
Image

Complete Re-manufacture with State-Of-The-Art Components

COC completely remanufactures the F-5 Generator using state of the art components, processes and finishes. Replacing a 70’s and 80’s designed component of an aging Northrop F-5 fighter, with a higher and better performing generator.

The Generator, including the Stator, Rotor, and End-Bell will be remanufactured to the specifications of T.O. 8A6-5-8-3 and T.O. 8A6-5-8-4.

The rotors are remanufactured, replacing the windings, insulation, and spacers systems, allowing for the resetting of the service life clock. Similarly for the generator stator, it will have new stator coils, slot content materials, series, and phase connections, as well as end winding basket components and insulators.

Armatures are remanufactured with insulators, finger plates and commutators.

A remanufactured F-5 Generator will result in better aircraft performance and provide power when needed.

Below are sample images of a Rotor, Stator and End-Bell in A/R condition

Image

Re-manufactured Components

In addition to remanufacturing the major components such as the Rotor, Stator and End- Bell, the outer housings are media cleaned, then primed and painted to the specified military specifications.

To your right is a sample list of the most common components that are remanufactured or repaired.

All generators are thoroughly tested in accordance with Section VII of the Technical Manual, number T.O. 8A6-5-8-3, before they are sent back to the customer.

Image

Below are examples of what the Rotor and Stator would like in their newly manufactured condition

Image
Image

Reassembly and Completion

PRICING IS AVAILABLE UPON REQUEST WE WILL PROVIDE PRICE BREAKS FOR 3, 5 AND 10 UNITS

INCLUDES A 2-YEAR WARRANTY

APPROXIMATE LEAD TIME IS 60 to 90 DAYS AFTER RECEIPT OF PURCHASE ORDER AND GENERATOR

WE WILL STRIVE TO SHORTEN THE LEAD TIME AS MUCH AS POSSIBLE

Image

Thank You

The COC F-5 Team

EXPERIENCE - OVER 5 DECADES YEARS SUPPORTING LEGACY AIRCRAFT
CUSTOMER SERVICE - OVER 50 YEARS SUPPORTING THE SAME CUSTOMERS
TRUST - ABOVE ALL, WE ALWAYS DO THE RIGHT THING

Image
COC Aerospace - Proprietary and Confidential Company Information

AS9100D